Looks like I will be taking a job in New Mexico (once the offer is finalized) and am considering putting my pdp-8s up for availability. I don't really do much with them, and hate the idea of storing, and shipping of both would be difficult (plus I don't know where I would be living for some time).
I have an 8i and 8e. The 8i is a four rack system, with TU56/TC08, RK8, two RK01s, lots of disks, PC8i (reader/punch), 8k core, 24k Fabrtitek expansion (does not work due to blown -15v transformer), 2 DF32s, DW08a, lots of books, lots of extra flip chips, lots of dectaps reels.
The 8e is a single rack system with 32k core, RK8e, 2 RK05s, many extra RK05 packs, VT52, VT510, and extra boards.
Contact me if interested.
I have an 8i and 8e. The 8i is a four rack system, with TU56/TC08, RK8, two RK01s, lots of disks, PC8i (reader/punch), 8k core, 24k Fabrtitek expansion (does not work due to blown -15v transformer), 2 DF32s, DW08a, lots of books, lots of extra flip chips, lots of dectaps reels.
The 8e is a single rack system with 32k core, RK8e, 2 RK05s, many extra RK05 packs, VT52, VT510, and extra boards.
Contact me if interested.